이 누리집은 대한민국 공식 전자정부 누리집입니다.

한상넷 로고한상넷

전체검색영역
[미국] HJ Andrews EF Electric Heat Pump Replacement
구분
지원사업/입찰
출처
중소기업수출지원센터
작성자
관리자
작성일
2017.07.26
원본

 

공고명: HJ Andrews EF Electric Heat Pump Replacement

게시일: 2017/07/25

마감일: 2017/08/14

수행지역: 미국

카테고리: 31 - 제조부품


공고내용

 

Solicitation Number :

AG-82FT-S-17-0021


Notice Type :

Combined Synopsis/Solicitation

 

Synopsis :


Added: Jul 24, 2017 3:40 pm
A. The contractor shall remove the existing Air Handler in the Utility room and the Air Conditioning unit for the Lanudry/Batrhoom system to the McRae Cafeteria building. The Contractor will also remove the existing R-22 Freon line and reclaim the R-22 refrigerant according to Oregon state law and EPA regulations including the old Air Conditioner and Air Handler. Install one new 240 Volt Single Phase, 2 Ton Electric Forced Air Handler (cap off the existing propane line) and customize existing duct work to adapt to the new Air Handler. Install one new 19.1 Seer 240 Volt Single Phase,2 Ton Heat Pump and new refrigerant lines from the Heat Pump to the Air Handler according to manufacturers specifications. Utilize the existing disconnect at the old Air Conditioning unit for the new Heat Pump. Run new conductor wire to the new 35 Amp Air Handler Panel per Oregon State Electrical code. Test all equipment after installation. Utilze the existing Carrier Infinity Touch electronic thermostat to operate the HVAC system.   2. HJ Andrews Experimental Forest McRae Cafeteria HVAC Replacement Option 1:   B. The contractor shall remove the existing Air Handler in the Utility room and the Air Conditioning that operates the Dining/Kitchen system in the McRae Cafeteria building. The Contractor shall remove the existing R-22 Freon line and reclaim the R-22 refrigerant according to Oregon state law and EPA regulations including the old Air Conditioner and Air Handler. In the Dining/Kitchen System install one new 240 Volt Single Phase, 5 Ton Electric Forced Air Handler (cap off the existing Propane line) and customize existing duct work to adapt to the new Air Handler. Install one new 18 Seer 240 Volt Single Phase, 5 Ton Heat Pump (Carrier 25VNA060A003 or equilivant) and new refrigerant lines from the Heat Pump to the Air Handler according to manufacturers specifications. Utilize the existing disconnect at the old Air Conditioning unit for the new Heat Pump. Run new conductors to the new 90 Amp Air Handler Panel per Oregon Statel Electrical code. Test all equipment after installation. Utilze the existing Carrier Infinity Touch electronic thermostat to operate the HVAC system.   3. HJ Andrews Experimental Forest McRae Cafeteria HVAC Replacement Option 2:   C. The contractor shall remove the existing Air Handler in the Utility room and the Air Conditioning that serves the Foyer in the McRae Cafeteria building. The Contractor will also remove the existing R-22 Freon line and reclaim the R-22 refrigerant according to Oregon state law and EPA regulations including the old Air Conditioner and Air Handler. Install one new 240 Volt Single Phase,4 Ton Electric Forced Air Handler (cap off the existing propane line) and customize existing duct work to adapt to the new Air Handler. Install one new 18.3 Seer 240 Volt Single Phase, 4 Ton Heat Pump (Carrier 25NAA048A003 or equilivant) and new refrigerant lines from the Heat Pump to the Air Handler according to manufacturers specifications. Utilize the existing disconnect at the old Air Conditioning unit for the new Heat Pump. Run new conductor wire to the new 80 Amp Air Handler Panel per Oregon State Electrical code. Test all equipment after installation. Utilze the existing Carrier Infinity Touch electronic thermostat to operate the HVAC system.     The allotted time for this contract is 30 days from the notice to proceed. Pre-proposal Site Visit - Upon Request. Location: HJ ANDREWS EXPERIMENTAL FOREST USFS ROAD 15-130-132 BLUE RIVER, OREGON 97413 The magnitude of this project is less than $25,000. This acquisition is 100% set-aside for Small Business concerns under NAICS Code 238220. Offerors shall submit all questions in writing by August 7, 2017. Questions shall be sent to asalas@fs.fed.us. Submit your proposal electronically to asalas@fs.fed.us, no later than August 14, 2017 11:00am MT.

 

Please consult the list of document viewers if you cannot open a file.


AG-82FT-S-17-0021


Type:

Other (Draft RFPs/RFIs, Responses to Questions, etc..)


Label:

AG-82FT-S-17-0021


Posted Date:

July 24, 2017

 

 

Solicitation_AG-82FT-S-17-0021.doc.pdf (3,089.35 Kb)

Description: AG-82FT-S-17-0021

 

Contracting Office Address :

240 West Prospect Road Fort Collins, Colorado 80526 United States


Place of Performance :

HJ Andrews Experimental Forest Blue River, Oregon 97413 United States


Primary Point of Contact. :


Anthony O Salas

asalas@fs.fed.us


원본 URL: https://www.fbo.gov/index?s=opportunity&mode=form&id=2e1040d5e71b01babe3b4665ee2d57c8&tab=core&_cview=0